ÍøÆØ³Ô¹Ï

Menu
Log in


Log in

How to Choose a Qualified Solar Installer

Qualifications

Each state has its own requirements for solar installers. 

In Illinois there is only one requirement to install solar. A solar installation company either needs to have a through the Illinois Commerce Commission or be working with a subcontractor who has this certification

In addition a certified electrician is required to pull permits for the work. This can also be the installer or a subcontractor.

Some additional credentials that may reinforce the quality of the installer are;

  • ÍøÆØ³Ô¹Ï Member - Member companies are committed to education and policy in Illinois and also offer homeowners a complaint resolution process.
  •  - This is the gold standard for solar installers.  NABCEP Certified installers have the experience and knowledge to design and build any system.

Considerations

You are probably not a good candidate for solar on your home or business if your roof:
  • is shaded by trees or surrounding structures
  • is in need of replacement in the next 5-10 years
  • is not owned by you (apartment buildings, condos)

Before choosing an installer

  • attend an ÍøÆØ³Ô¹Ï public education webinar, watch a pre-recorded webinar, or download the slides from the presentation
  • talk to or attend a ÍøÆØ³Ô¹Ï Solar Ambassador event
  • visit the ÍøÆØ³Ô¹Ï find a professional page and get a few quotes
  • learn about net metering rates from your utility company
  • understand
  • look into the type and quality of materials used by installer (Modules, Inverters, Racking & Flashings)
  • understand the warranties offered on products and the installer's craftsmanship

Once you've chosen an installer

If your installer is not an electrical contractor or doing 100% of the work, then they will be subcontracting some of the work.  You should find out who this is, what their craftsmanship warranties are, and possibly ask for referrals. If any of the work is subcontracted you should make sure to get a lien release before the final payment so that they can't hold payment against your house or building. 

Items that should be in your contract:

  • who is responsible for permits and fees (e.g. structural engineering stamp) and how much they are (each town has its own requirements)
  • craftsmanship warranty (5 year labor warranty is standard in the solar industry)
  • know the warranties on the equipment
  • who is filing out the paperwork to sell your SREC’s
  • who is handling quarterly SREC statements
  • what are the fees involved for selling your SRECs
  • fair payment schedule for both parties. We advise not to pay the contractor all of the money up front.


CONNECT

SEARCH

ÍøÆØ³Ô¹Ï 440 W Colfax, #1578 Palatine, IL 60067 | contactisea@illinoissolar.org

Copyright © 2009 - 2018 ÍøÆØ³Ô¹Ï

Powered by Membership Software